HomellyaImmo SaaS

The property management platform for modern landlords.

Secure payments:VisaMastercardStripe

Product

  • Home
  • Pricing
  • Features
  • Request a demo

Support

  • Help center
  • FAQ
  • Contact support

Legal

  • Legal notice
  • Privacy policy
  • Data protection & security
  • Cookies & settings
  • Terms of use
  • Terms of sale
  • Electronic signature terms of use

Company

  • About Homellya
  • Contact

© 2026 Homellya. All rights reserved.

•Hosting: OVHcloud
  1. Home
  2. ›
  3. Resource center
  4. ›
  5. Rental management
  6. ›
  7. Works during a French tenancy: repairs and access to the home
Rental management

Works during a French tenancy: repairs and access to the home

HomellyaOctober 29, 20267 min read
Works during a French tenancy: repairs and access to the home

Works in an occupied home require responsibility, information and access to be coordinated. A landlord's duty to repair is not a general right to enter whenever convenient.

This guide covers French private main-residence rentals. It addresses organising intervention, complementing the repair responsibility guide.

1. Classify the work and urgency

Identify maintenance, repair, improvement, energy work or compliance work. Not every intervention an owner wants has the same legal access basis.

An active leak first requires damage limitation and prompt contact; planned refurbishment follows a different timetable. The water leak guide separates immediate action from final cost allocation.

2. Inform the tenant before work begins

For work governed by the statutory duties, the landlord gives notification by hand or registered letter with acknowledgement of receipt. Explain the intervention and arrangements, including start, duration, preparation and access needs.

Practical discussion with a contractor does not automatically replace this information. The official landlord works guide (opens in a new tab) explains the framework. Explain material changes rather than letting the tenant discover a different project.

3. Arrange agreed access

BeforeDuringAfterwards
Work, contacts and appointmentAccess to necessary areas, protection and change updatesReport, reservations and reinstatement
Agreed key arrangementsPrivacy and agreed boundariesFunctional check
Noise, interruptions and unavailable facilitiesUpdates if timing changesRecords and further visit if needed

Tenants must allow access for qualifying work, but are not required to grant it on Saturdays, Sundays or public holidays without agreement. This does not authorise forced entry or unilateral use of a spare key. Read the official owner-access rules (opens in a new tab).

4. Keep useful condition records

Record relevant areas before work. Afterwards, note completed repairs, anything untested and possible additional damage. Contextual photographs help when dated and limited to the purpose.

Written reservations avoid a job being treated as complete while equipment remains unusable. Do not rewrite the original inspection; add the intervention to the history.

5. Consider disruption and possible rent reduction

Where qualifying work lasts more than 21 days, consider a proportionate rent reduction according to duration and the part of the home unavailable. This is not automatically a free month or identical allowance for every project. Article 1724 of the Civil Code and tenancy rules provide the framework.

If work is abusive, differs from notification or seriously affects use, the tenant can seek appropriate court measures. This should not be confused with a general right to stop all rent unilaterally. The official works guide (opens in a new tab) explains possible remedies.

6. Handle disagreement without forcing entry

If access is refused, review notice, reasons, appointments and constraints. Propose checkable arrangements. If necessary work remains blocked, seek the appropriate remedy instead of treating refusal as permission to enter using retained keys.

Where the landlord fails to act, the tenant should report and then formalise the request as appropriate. Our damp housing guide illustrates why diagnosis and correspondence matter.

Retain notices, appointments, quotations, agreements, invoices and reports with rental records. Cost allocation and access arrangements should remain identifiable decisions.

Frequently asked questions

Must the tenant attend every appointment?

Arrangements can be agreed, but absence does not grant unlimited access. Specify who enters, when and for what purpose.

Do works automatically permit higher rent?

No. Our rent increase guide separates maintenance, improvement and any permitted increase conditions.

Sources checked on 29 October 2026: Articles 6–7 of the 1989 law (opens in a new tab), Service Public on works and access (opens in a new tab). General information about French law.

Related reading

  • Rental managementRental repairs in France: does the landlord or tenant pay?
  • Rent and receiptsF- or G-rated homes in France: can the rent increase?
  • Rental managementRental management in France: which documents should landlords keep and for how long?